Potterton Gold 24 part L boiler change pack

£652.50 Excl. Tax: £652.50 Incl. Tax:

Not yet rated

There are no reviews yet.

Availability: In stock

Make sure your new boiler installation complies with building regulations with a Mr Central Heating favourite combi boiler, and this Part L compliant boiler change pack from Potterton. In addition to an efficient and reliable Potterton Gold 24he combination boiler, the pack includes thermostatic radiator valves and a room thermostat – so you can upgrade your heating system with confidence that you are meeting building regulations part L

Pack contents:
  • 1 x Potterton Gold 24he Combination boiler

  • 1 x Potterton standard horizontal flue kit

  • 1 x built in 24-hour clock

  • 1 x filler loop

  • 7 x 15mm thermostatic radiator valves

  • 1 x Salus ET20RF radio frequency room thermostat

  • 1 x inhibitor

  • 1 x cleanser

  • 1 x limebeater
Manufacturer Product Number
Not Applicable
Manufacturers Warranty
2 Years (Subject to Manufacturers T&C's)
Warranty Terms and Conditions
Boiler Type
Combination Boiler
Boiler CH Output (Kw)
Sedbuk Rating
A - Rated
Energy Efficiency
Radiator valve type
Fuel Used
Natural Gas
Manufacturers brochure PDF File
Installation PDF File
Type of pipe in pack
Pipe not included
Pack radiator choices
Heating pack with no radiators
Boiler packages
Part L Boiler change packs
Valves in pack
Thermostatic only
Please configure your product using the options below

Not yet rated

There are no reviews yet.

Configure your multipack - Once you have selected all your options please click add to basket

* Required Fields

Included in this Part L Pack*
£652.50 Excl. Tax: £652.50 Incl. Tax:

Availability: In stock

£652.50 Excl. Tax £783.00 Incl. Tax